Other Items

BS 1377 Part 6 Consolidation and permeability tests with pore pressure measurement

BS 1377 Part 6 Consolidation and permeability tests with pore pressure measurement

Item UKAS Description £ Unit
6.08   Consolidation using a hydraulic Cell 76mm test period 4 Days Coefficient-s of Consolidation and Compressibility PLEASE NOTE IT IS LIKELY THIS TEST WILL INCUR EXTRA OVER DAY CHARGES.
BS 1377:1990 - Part 6 : 3 
252.00
per test 
6.01 UKAS Determination of Permeability in a triaxial cell PLEASE NOTE IT IS LIKELY THIS TEST WILL INCUR EXTRA OVER DAY CHARGES.
BS 1377:1990 - Part 6 : 6 
105.00
per test 
6.06   Determination of Permeabilty using Falling Head Permeameter
 
105.00
 
6.05   Extra over days for item 6.04
 
23.10
per day 
6.10   Extra over days for items 6.07 & 6.08 Hydraulic Cell tests
 
31.50
per day 
6.09   Extra Over days for Triaxial Permeability tests (4 Days Over)
 
26.25
per day 
6.04   Isotropic Consolidation in a Triaxial Cell up to 6 days duration PLEASE NOTE IT IS LIKELY THIS TEST WILL INCUR EXTRA OVER DAY CHARGES.
BS 1377:1990 - Part 6 : 5 
168.00
per test 
6.07   Permeability in a Hydraulic Consolidation Cell up to 6 days duration Price for 75mm PLEASE NOTE IT IS LIKELY THIS TEST WILL INCUR EXTRA OVER DAY CHARGES.
BS 1377:1990 - Part 6 : 4 
252.00
per test 
6.02 UKAS Procedure for the Determination of the Permeability of Clayey Soils in a Triaxial Cell Using the Accelerated Permeability Test PLEASE NOTE IT IS LIKELY THIS TEST WILL INCUR EXTRA OVER DAY CHARGES.
Environment Agency Method P1-398/TR/2 
105.00
per test 
6.11   Re-moulding Sample to Specified Moisture Content
 
10.50
 
6.03   Triaxial Permeability Test with One Back Pressure System PLEASE NOTE IT IS LIKELY THIS TEST WILL INCUR EXTRA OVER DAY CHARGES.
Head K H, Vol. 3, Clause 20.4.2 
105.00
per test