|
Item | UKAS | Description | £ | Unit |
6.08 | Consolidation using a hydraulic Cell 76mm test period 4 Days
Coefficient-s of Consolidation and Compressibility
PLEASE NOTE IT IS LIKELY THIS TEST WILL INCUR EXTRA OVER DAY CHARGES.
BS 1377:1990 - Part 6 : 3 |
252.00
|
per test | |
6.01 | UKAS | Determination of Permeability in a triaxial cell
PLEASE NOTE IT IS LIKELY THIS TEST WILL INCUR EXTRA OVER DAY CHARGES.
BS 1377:1990 - Part 6 : 6 |
105.00
|
per test |
6.06 | Determination of Permeabilty using Falling Head Permeameter
|
105.00
|
||
6.05 | Extra over days for item 6.04
|
23.10
|
per day | |
6.10 | Extra over days for items 6.07 & 6.08 Hydraulic Cell tests
|
31.50
|
per day | |
6.09 | Extra Over days for Triaxial Permeability tests (4 Days Over)
|
26.25
|
per day | |
6.04 | Isotropic Consolidation in a Triaxial Cell up to 6 days duration
PLEASE NOTE IT IS LIKELY THIS TEST WILL INCUR EXTRA OVER DAY CHARGES.
BS 1377:1990 - Part 6 : 5 |
168.00
|
per test | |
6.07 | Permeability in a Hydraulic Consolidation Cell
up to 6 days duration
Price for 75mm
PLEASE NOTE IT IS LIKELY THIS TEST WILL INCUR EXTRA OVER DAY CHARGES.
BS 1377:1990 - Part 6 : 4 |
252.00
|
per test | |
6.02 | UKAS | Procedure for the Determination of the
Permeability of Clayey Soils in a Triaxial Cell
Using the Accelerated Permeability Test
PLEASE NOTE IT IS LIKELY THIS TEST WILL INCUR EXTRA OVER DAY CHARGES.
Environment Agency Method P1-398/TR/2 |
105.00
|
per test |
6.11 | Re-moulding Sample to Specified Moisture Content
|
10.50
|
||
6.03 | Triaxial Permeability Test with One Back Pressure System
PLEASE NOTE IT IS LIKELY THIS TEST WILL INCUR EXTRA OVER DAY CHARGES.
Head K H, Vol. 3, Clause 20.4.2 |
105.00
|
per test |