Other Items

BS 1377 Part 4 Compaction-related tests

BS 1377 Part 4 Compaction-related tests

Item UKAS Description £ Unit
4.18 UKAS CBR :Remoulded with 2.5kg Rammer and tested at top and bottom
BS 1377:1990 - Part 4 : 7 
52.00
per test 
4.16 UKAS CBR at each Compaction point (5 Points) excludes compaction test
BS 1377:1990 - Part 4 : 7 
105.00
per sample 
4.11 UKAS CBR: Rem specified MC and tested at top only
BS 1377:1990 - Part 4 : 7 
48.00
per test 
4.10 UKAS CBR: Remoulded Specimen and tested at top only
BS 1377:1990 - Part 4 : 7 
42.00
per test 
4.08   Chalk Crushing Value 1 Point
BS 1377:1990 - Part 4 : 6.4 
18.90
per test 
4.20 UKAS Compaction/CBR 5 Point/ MCV 5 Point
 
168.00
per suite 
4.15   Determination of the Swelling Potential of Fill Material (Rapid Slag Expansion Test)
In House Test Method DIHM 003 
105.00
per test 
4.01 UKAS Dry Den/MC (2.5kg Rammer Method 1 Litre Mould)
BS 1377:1990 - Part 4 : 3.3 
50.40
per test 
4.02 UKAS Dry Den/MC (2.5kg Rammer Method CBR Mould)
BS 1377:1990 - Part 4 : 3.4 
60.40
per test 
4.03 UKAS Dry Den/MC (4.5kg Rammer Method 1 Litre Mould)
BS 1377:1990 - Part 4 : 3.5 
53.55
per test 
4.04 UKAS Dry Den/MC (4.5kg Rammer Method CBR Mould)
BS 1377:1990 - Part 4 : 3.6 
63.55
per test 
4.05 UKAS Dry Den/MC (Vibrating Hammer Method)
BS 1377:1990 - Part 4 : 3.7 
65.00
per test 
4.13   Max Density Cohesionless Soil
BS 1377:1990 - Part 4 : 4.2 
32.55
per test 
4.06 UKAS MCV at as received Moisture Content
BS 1377:1990 - Part 4 : 5.4 
19.95
per test 
4.07 UKAS MCV/Moisture Content Relation
BS 1377:1990 - Part 4 : 5.5 
82.95
per test 
4.14   Min Density Cohesionless Soil
BS 1377:1990 - Part 4 : 4.5 
22.05
per test 
4.17 UKAS Remoulded Bulk/Dry Density on a disturbed sample
BS 1377:1990 - Part 4 : 4.3/4.4 
16.80
per test 
4.12   Soaking CBR specimens
BS 1377:1990 - Part 4 : 7.3 
7.35
per day